PRA Builder
Projects
Risk Library
High-Risk Work Items
High-Risk Work Items
Manage the master checklist used by project PRA exports.
New item
Sort order
Active
Add Item
Description
Sort
Active
Save
Involves a risk of a person falling more than 2 metres.
Save
Is carried out on a telecommunication tower.
Save
Involves demolition of an element of a structure that is load bearing or otherwise related to the physical integrity of the structure.
Save
Involves, or is likely to involve, the disturbance of asbestos.
Save
Involves structural alterations or repairs that require temporary support to prevent collapse.
Save
Is carried out in or near a confined space.
Save
Is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel.
Save
Involves the use of explosives.
Save
Is carried out on or near pressurised gas distribution mains or piping.
Save
Is carried out on or near chemical, fuel, or refrigerant lines.
Save
Is carried out on or near energised electrical installations or services.
Save
Is carried out in an area that may have a contaminated or flammable atmosphere.
Save
Involves tilt up or precast concrete.
Save
Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians.
Save
Is carried out in an area at a workplace in which there is any movement of powered mobile plant.
Save
Is carried out in an area in which there are artificial extremes of temperature.
Save
Is carried out in or near water or other liquid that involves a risk of drowning.
Save
Involves diving work.
Save
Involves processing crystalline silica material using a power tool or another mechanical method.
Save