Library risks are templates. Project copies can be edited independently.
Section
Choose section
PRE-CONSTRUCTION / 1. BRIEF
PRE-CONSTRUCTION / 2. DESIGN
PRE-CONSTRUCTION / 3. CONSULTANTS
PRE-CONSTRUCTION / 4. PROGRAM
PRE-CONSTRUCTION / 5. APPROVALS
PRE-CONSTRUCTION / 6. EXISTING BUILDING
PRE-CONSTRUCTION / 7. INSURANCES
PRE-CONSTRUCTION / 8. CONTRACTORS
PRE-CONSTRUCTION / 9. MAINTENANCE
PRE-CONSTRUCTION / 10. BUILDABILITY
PRE-CONSTRUCTION / 11. INDUSTRIAL
PRE-CONSTRUCTION / 12. HEALTH SURVEILLANCE
CONSTRUCTION / 1. EMERGENCY PLANNING
CONSTRUCTION / 2. PUBLIC DEMONSTRATION
CONSTRUCTION / 3. SITE ESTABLISHMENT
CONSTRUCTION / 4. ACCESS / EGRESS & HOUSEKEEPING
CONSTRUCTION / 5. CAR PARKING AND PEDESTRIAN MOVEMENT
CONSTRUCTION / 6. TRAFFIC
CONSTRUCTION / 7. EMERGENCY VEHICLES
CONSTRUCTION / 8. SEGREGATION
CONSTRUCTION / 9. PUBLIC PROTECTION
CONSTRUCTION / 10. MANUAL HANDLING
CONSTRUCTION / 11. NOISE
CONSTRUCTION / 12. WORKING AT HEIGHTS
CONSTRUCTION / 13. PENETRATIONS
CONSTRUCTION / 14. FALLING OBJECTS
CONSTRUCTION / 15. CRANES
CONSTRUCTION / 16. CONCRETE PUMPS
CONSTRUCTION / 17. INSTALLING TILT UP OR PRE-CAST CONCRETE PANELS
CONSTRUCTION / 18. INSTALLING HANDRAILS & TEMPORARY EDGE PROTECTION
CONSTRUCTION / 19. WORK ON OR NEAR CHEMICAL, FUEL OR REFRIGERANT LINES
CONSTRUCTION / 20. USING A MOBILE SCAFFOLD / EWP
CONSTRUCTION / 21. CONFINED SPACES
CONSTRUCTION / 22. WORK ON OR NEAR PRESSURISED GAS PIPES OR MAINS
CONSTRUCTION / 23. ELECTRICAL WORK
CONSTRUCTION / 24. ELECTRICAL ISOLATION
CONSTRUCTION / 25. ELECTRICAL RE-ENERGISATION
CONSTRUCTION / 26. USING ELECTRICAL TOOLS
CONSTRUCTION / 27. ASBESTOS
CONSTRUCTION / 28. USE OF HAZARDOUS CHEMICALS / SUBSTANCES
CONSTRUCTION / 29. ERECTING SITE FENCING
CONSTRUCTION / 30. MOBILE PLANT
CONSTRUCTION / 31. USE OF TOOLS / MACHINERY (Minor Plant)
CONSTRUCTION / 32. WORKERS IN AREAS OF HEAVY PLANT / VEHICLE MOVEMENT
CONSTRUCTION / 33. WORKING ON OR NEAR PUBLIC ROADS
CONSTRUCTION / 34. WORKING ON OR NEAR WATER
CONSTRUCTION / 35. EXCAVATIONS
CONSTRUCTION / 36. EXTREME HEAT
CONSTRUCTION / 37. ENVIRONMENTAL
CONSTRUCTION / 38. SUBSTATIONS WORKS (Installation or Removal)
CONSTRUCTION / 39. WORK ON OR NEAR ENERGISED ELECTRICAL INSTALLATIONS OR SERVICES
CONSTRUCTION / 40. SHIPPING CONTAINERS AND SITE SHEDS
CONSTRUCTION / 41. DELIVERY / REMOVAL
CONSTRUCTION / 42. DAILY USE
CONSTRUCTION / 43. TREE REMOVAL
CONSTRUCTION / 44. DEMOLITION
CONSTRUCTION / 45. BULK EARTHWORKS
CONSTRUCTION / 46. DETAILED EARTHWORKS / DRAINAGE
CONSTRUCTION / 47. INSTALLING ELECTRICITY TO SITE SHED AND TEMPORARY BOARDS FOR WORK SITE
CONSTRUCTION / 48. FORMWORK
CONSTRUCTION / 49. REINFORCEMENT
CONSTRUCTION / 50. POST TENSIONING (PT)
CONSTRUCTION / 51. CONCRETE POURS
CONSTRUCTION / 52. SCAFFOLD
CONSTRUCTION / 53. WELDING
CONSTRUCTION / 54. STRUCTURAL STEEL
CONSTRUCTION / 55. BLOCKWORK / BRICKWORK / ROCK WALLS
CONSTRUCTION / 56. LIFT CONSTRUCTION
CONSTRUCTION / 57. WATERPROOFING
CONSTRUCTION / 58. RENDER
CONSTRUCTION / 59. ALUCABOND OR SIMILAR
CONSTRUCTION / 60. ROOF TRUSSES
CONSTRUCTION / 61. METAL ROOFER
CONSTRUCTION / 62. ROOF TILING
CONSTRUCTION / 63. MEMBRANE
CONSTRUCTION / 64. SOFFIT
CONSTRUCTION / 65. ROOF RESTRAINT SYSTEM
CONSTRUCTION / 66. SPRINKLERS
CONSTRUCTION / 67. FIRE SERVICES
CONSTRUCTION / 68. HYDRAULIC SERVICES
CONSTRUCTION / 69. SECURITY
CONSTRUCTION / 70. DATA
CONSTRUCTION / 71. MECHANICAL
CONSTRUCTION / 72. DRY WALLS AND CEILINGS
CONSTRUCTION / 73. CARPENTRY FIX
CONSTRUCTION / 74. SUNSHADES
CONSTRUCTION / 75. WINDOWS AND DOORS
CONSTRUCTION / 76. PAINTER
CONSTRUCTION / 77. GLAZIER
CONSTRUCTION / 78. JOINERY
CONSTRUCTION / 79. TOILET PARTITIONS
CONSTRUCTION / 80. FLOORING CARPET / VINYL
CONSTRUCTION / 81. FLOORING TIMBER
CONSTRUCTION / 82. CERAMIC TILING
CONSTRUCTION / 83. BLINDS
CONSTRUCTION / 84. HANDRAILS / METALWORK
CONSTRUCTION / 85. SIGNAGE
CONSTRUCTION / 86. BITUMEN PAVING
CONSTRUCTION / 87. LANDSCAPING
CONSTRUCTION / 88. FINAL CLEAN
CONSTRUCTION / 89. PERSONAL HAZARDS
CONSTRUCTION / 90. PLANT / MACHINERY
CONSTRUCTION / 91. SUPERVISION OF APPRENTICES (APPRENTICES, TRAINEES & YOUNG WORKERS)
POST CONSTRUCTION / 1. COMMISSION PLANT
POST CONSTRUCTION / 2. BUILDING MAINTAINABILITY
Hazard / risk
Risks to a worker, health & safety
Default risk level
Default residual risk
Default control measure
Control measures are set out in the hierarchy of control described below. Risks to work health and safety should be identified and eliminated. If it is not reasonably practicable to eliminate them, they should be minimised by implementing controls at the top of the hierarchy below before consideration is given to using lower order controls. USE THE HIERARCHY OF RISK CONTROLS: Elimination Road, footpath, cycle path and shared use path closures. Substitution Program the work to be conducted when there is no risk or significantly less risk present. Isolation Use approved temporary road safety barriers to isolate workers and work activities from road users. Engineering Controls Temporary by-pass roads. Traffic engineering, such as the use of directional signage, insert chicane type devices to slow path users / traffic down, (e.g. workmen ahead, speed reduction, lane status signs, as well as cones, bollards, delineators, barrier boards etc.) Administrative Controls Safe working practices put in place, training instruction, nationally recognised traffic controller training and information provided to workers. Personal Protective & Safety Equipment (PPE) High visibility garments worn when working in the vicinity of moving traffic (up to 5 m) or plant. When selecting high visibility garments consideration needs to be given to the time of day, colour of plant on site and the surrounding environment. Weekly monitoring / inspections of the Traffic Management / Control Plan to be carried out to ensure all traffic control devices are as per the TTM Plan.
Default responsible party
Tags
High-risk category
Active