PRA Builder
Projects
Risk Library
High-Risk Work Items
Edit Library Risk
Library risks are templates. Project copies can be edited independently.
Section
Choose section
PRE-CONSTRUCTION / 1. BRIEF
PRE-CONSTRUCTION / 2. DESIGN
PRE-CONSTRUCTION / 3. CONSULTANTS
PRE-CONSTRUCTION / 4. PROGRAM
PRE-CONSTRUCTION / 5. APPROVALS
PRE-CONSTRUCTION / 6. EXISTING BUILDING
PRE-CONSTRUCTION / 7. INSURANCES
PRE-CONSTRUCTION / 8. CONTRACTORS
PRE-CONSTRUCTION / 9. MAINTENANCE
PRE-CONSTRUCTION / 10. BUILDABILITY
PRE-CONSTRUCTION / 11. INDUSTRIAL
PRE-CONSTRUCTION / 12. HEALTH SURVEILLANCE
CONSTRUCTION / 1. EMERGENCY PLANNING
CONSTRUCTION / 2. PUBLIC DEMONSTRATION
CONSTRUCTION / 3. SITE ESTABLISHMENT
CONSTRUCTION / 4. ACCESS / EGRESS & HOUSEKEEPING
CONSTRUCTION / 5. CAR PARKING AND PEDESTRIAN MOVEMENT
CONSTRUCTION / 6. TRAFFIC
CONSTRUCTION / 7. EMERGENCY VEHICLES
CONSTRUCTION / 8. SEGREGATION
CONSTRUCTION / 9. PUBLIC PROTECTION
CONSTRUCTION / 10. MANUAL HANDLING
CONSTRUCTION / 11. NOISE
CONSTRUCTION / 12. WORKING AT HEIGHTS
CONSTRUCTION / 13. PENETRATIONS
CONSTRUCTION / 14. FALLING OBJECTS
CONSTRUCTION / 15. CRANES
CONSTRUCTION / 16. CONCRETE PUMPS
CONSTRUCTION / 17. INSTALLING TILT UP OR PRE-CAST CONCRETE PANELS
CONSTRUCTION / 18. INSTALLING HANDRAILS & TEMPORARY EDGE PROTECTION
CONSTRUCTION / 19. WORK ON OR NEAR CHEMICAL, FUEL OR REFRIGERANT LINES
CONSTRUCTION / 20. USING A MOBILE SCAFFOLD / EWP
CONSTRUCTION / 21. CONFINED SPACES
CONSTRUCTION / 22. WORK ON OR NEAR PRESSURISED GAS PIPES OR MAINS
CONSTRUCTION / 23. ELECTRICAL WORK
CONSTRUCTION / 24. ELECTRICAL ISOLATION
CONSTRUCTION / 25. ELECTRICAL RE-ENERGISATION
CONSTRUCTION / 26. USING ELECTRICAL TOOLS
CONSTRUCTION / 27. ASBESTOS
CONSTRUCTION / 28. USE OF HAZARDOUS CHEMICALS / SUBSTANCES
CONSTRUCTION / 29. ERECTING SITE FENCING
CONSTRUCTION / 30. MOBILE PLANT
CONSTRUCTION / 31. USE OF TOOLS / MACHINERY (Minor Plant)
CONSTRUCTION / 32. WORKERS IN AREAS OF HEAVY PLANT / VEHICLE MOVEMENT
CONSTRUCTION / 33. WORKING ON OR NEAR PUBLIC ROADS
CONSTRUCTION / 34. WORKING ON OR NEAR WATER
CONSTRUCTION / 35. EXCAVATIONS
CONSTRUCTION / 36. EXTREME HEAT
CONSTRUCTION / 37. ENVIRONMENTAL
CONSTRUCTION / 38. SUBSTATIONS WORKS (Installation or Removal)
CONSTRUCTION / 39. WORK ON OR NEAR ENERGISED ELECTRICAL INSTALLATIONS OR SERVICES
CONSTRUCTION / 40. SHIPPING CONTAINERS AND SITE SHEDS
CONSTRUCTION / 41. DELIVERY / REMOVAL
CONSTRUCTION / 42. DAILY USE
CONSTRUCTION / 43. TREE REMOVAL
CONSTRUCTION / 44. DEMOLITION
CONSTRUCTION / 45. BULK EARTHWORKS
CONSTRUCTION / 46. DETAILED EARTHWORKS / DRAINAGE
CONSTRUCTION / 47. INSTALLING ELECTRICITY TO SITE SHED AND TEMPORARY BOARDS FOR WORK SITE
CONSTRUCTION / 48. FORMWORK
CONSTRUCTION / 49. REINFORCEMENT
CONSTRUCTION / 50. POST TENSIONING (PT)
CONSTRUCTION / 51. CONCRETE POURS
CONSTRUCTION / 52. SCAFFOLD
CONSTRUCTION / 53. WELDING
CONSTRUCTION / 54. STRUCTURAL STEEL
CONSTRUCTION / 55. BLOCKWORK / BRICKWORK / ROCK WALLS
CONSTRUCTION / 56. LIFT CONSTRUCTION
CONSTRUCTION / 57. WATERPROOFING
CONSTRUCTION / 58. RENDER
CONSTRUCTION / 59. ALUCABOND OR SIMILAR
CONSTRUCTION / 60. ROOF TRUSSES
CONSTRUCTION / 61. METAL ROOFER
CONSTRUCTION / 62. ROOF TILING
CONSTRUCTION / 63. MEMBRANE
CONSTRUCTION / 64. SOFFIT
CONSTRUCTION / 65. ROOF RESTRAINT SYSTEM
CONSTRUCTION / 66. SPRINKLERS
CONSTRUCTION / 67. FIRE SERVICES
CONSTRUCTION / 68. HYDRAULIC SERVICES
CONSTRUCTION / 69. SECURITY
CONSTRUCTION / 70. DATA
CONSTRUCTION / 71. MECHANICAL
CONSTRUCTION / 72. DRY WALLS AND CEILINGS
CONSTRUCTION / 73. CARPENTRY FIX
CONSTRUCTION / 74. SUNSHADES
CONSTRUCTION / 75. WINDOWS AND DOORS
CONSTRUCTION / 76. PAINTER
CONSTRUCTION / 77. GLAZIER
CONSTRUCTION / 78. JOINERY
CONSTRUCTION / 79. TOILET PARTITIONS
CONSTRUCTION / 80. FLOORING CARPET / VINYL
CONSTRUCTION / 81. FLOORING TIMBER
CONSTRUCTION / 82. CERAMIC TILING
CONSTRUCTION / 83. BLINDS
CONSTRUCTION / 84. HANDRAILS / METALWORK
CONSTRUCTION / 85. SIGNAGE
CONSTRUCTION / 86. BITUMEN PAVING
CONSTRUCTION / 87. LANDSCAPING
CONSTRUCTION / 88. FINAL CLEAN
CONSTRUCTION / 89. PERSONAL HAZARDS
CONSTRUCTION / 90. PLANT / MACHINERY
CONSTRUCTION / 91. SUPERVISION OF APPRENTICES (APPRENTICES, TRAINEES & YOUNG WORKERS)
POST CONSTRUCTION / 1. COMMISSION PLANT
POST CONSTRUCTION / 2. BUILDING MAINTAINABILITY
Hazard / risk
Cranes and pumps
Default risk level
Default residual risk
Default control measure
Trained operator, maintained equipment, logbooks.
Default responsible party
Tags
High-risk category
Active
Save Library Risk
Cancel