Section
Choose section
PRE-CONSTRUCTION / 1. BRIEF
PRE-CONSTRUCTION / 2. DESIGN
PRE-CONSTRUCTION / 3. CONSULTANTS
PRE-CONSTRUCTION / 4. PROGRAM
PRE-CONSTRUCTION / 5. APPROVALS
PRE-CONSTRUCTION / 6. EXISTING BUILDING
PRE-CONSTRUCTION / 7. INSURANCES
PRE-CONSTRUCTION / 8. CONTRACTORS
PRE-CONSTRUCTION / 9. MAINTENANCE
PRE-CONSTRUCTION / 10. BUILDABILITY
PRE-CONSTRUCTION / 11. INDUSTRIAL
PRE-CONSTRUCTION / 12. HEALTH SURVEILLANCE
CONSTRUCTION / 1. EMERGENCY PLANNING
CONSTRUCTION / 2. PUBLIC DEMONSTRATION
CONSTRUCTION / 3. SITE ESTABLISHMENT
CONSTRUCTION / 4. ACCESS / EGRESS & HOUSEKEEPING
CONSTRUCTION / 5. CAR PARKING AND PEDESTRIAN MOVEMENT
CONSTRUCTION / 6. TRAFFIC
CONSTRUCTION / 7. EMERGENCY VEHICLES
CONSTRUCTION / 8. SEGREGATION
CONSTRUCTION / 9. PUBLIC PROTECTION
CONSTRUCTION / 10. MANUAL HANDLING
CONSTRUCTION / 11. NOISE
CONSTRUCTION / 12. WORKING AT HEIGHTS
CONSTRUCTION / 13. PENETRATIONS
CONSTRUCTION / 14. FALLING OBJECTS
CONSTRUCTION / 15. CRANES
CONSTRUCTION / 16. CONCRETE PUMPS
CONSTRUCTION / 17. INSTALLING TILT UP OR PRE-CAST CONCRETE PANELS
CONSTRUCTION / 18. INSTALLING HANDRAILS & TEMPORARY EDGE PROTECTION
CONSTRUCTION / 19. WORK ON OR NEAR CHEMICAL, FUEL OR REFRIGERANT LINES
CONSTRUCTION / 20. USING A MOBILE SCAFFOLD / EWP
CONSTRUCTION / 21. CONFINED SPACES
CONSTRUCTION / 22. WORK ON OR NEAR PRESSURISED GAS PIPES OR MAINS
CONSTRUCTION / 23. ELECTRICAL WORK
CONSTRUCTION / 24. ELECTRICAL ISOLATION
CONSTRUCTION / 25. ELECTRICAL RE-ENERGISATION
CONSTRUCTION / 26. USING ELECTRICAL TOOLS
CONSTRUCTION / 27. ASBESTOS
CONSTRUCTION / 28. USE OF HAZARDOUS CHEMICALS / SUBSTANCES
CONSTRUCTION / 29. ERECTING SITE FENCING
CONSTRUCTION / 30. MOBILE PLANT
CONSTRUCTION / 31. USE OF TOOLS / MACHINERY (Minor Plant)
CONSTRUCTION / 32. WORKERS IN AREAS OF HEAVY PLANT / VEHICLE MOVEMENT
CONSTRUCTION / 33. WORKING ON OR NEAR PUBLIC ROADS
CONSTRUCTION / 34. WORKING ON OR NEAR WATER
CONSTRUCTION / 35. EXCAVATIONS
CONSTRUCTION / 36. EXTREME HEAT
CONSTRUCTION / 37. ENVIRONMENTAL
CONSTRUCTION / 38. SUBSTATIONS WORKS (Installation or Removal)
CONSTRUCTION / 39. WORK ON OR NEAR ENERGISED ELECTRICAL INSTALLATIONS OR SERVICES
CONSTRUCTION / 40. SHIPPING CONTAINERS AND SITE SHEDS
CONSTRUCTION / 41. DELIVERY / REMOVAL
CONSTRUCTION / 42. DAILY USE
CONSTRUCTION / 43. TREE REMOVAL
CONSTRUCTION / 44. DEMOLITION
CONSTRUCTION / 45. BULK EARTHWORKS
CONSTRUCTION / 46. DETAILED EARTHWORKS / DRAINAGE
CONSTRUCTION / 47. INSTALLING ELECTRICITY TO SITE SHED AND TEMPORARY BOARDS FOR WORK SITE
CONSTRUCTION / 48. FORMWORK
CONSTRUCTION / 49. REINFORCEMENT
CONSTRUCTION / 50. POST TENSIONING (PT)
CONSTRUCTION / 51. CONCRETE POURS
CONSTRUCTION / 52. SCAFFOLD
CONSTRUCTION / 53. WELDING
CONSTRUCTION / 54. STRUCTURAL STEEL
CONSTRUCTION / 55. BLOCKWORK / BRICKWORK / ROCK WALLS
CONSTRUCTION / 56. LIFT CONSTRUCTION
CONSTRUCTION / 57. WATERPROOFING
CONSTRUCTION / 58. RENDER
CONSTRUCTION / 59. ALUCABOND OR SIMILAR
CONSTRUCTION / 60. ROOF TRUSSES
CONSTRUCTION / 61. METAL ROOFER
CONSTRUCTION / 62. ROOF TILING
CONSTRUCTION / 63. MEMBRANE
CONSTRUCTION / 64. SOFFIT
CONSTRUCTION / 65. ROOF RESTRAINT SYSTEM
CONSTRUCTION / 66. SPRINKLERS
CONSTRUCTION / 67. FIRE SERVICES
CONSTRUCTION / 68. HYDRAULIC SERVICES
CONSTRUCTION / 69. SECURITY
CONSTRUCTION / 70. DATA
CONSTRUCTION / 71. MECHANICAL
CONSTRUCTION / 72. DRY WALLS AND CEILINGS
CONSTRUCTION / 73. CARPENTRY FIX
CONSTRUCTION / 74. SUNSHADES
CONSTRUCTION / 75. WINDOWS AND DOORS
CONSTRUCTION / 76. PAINTER
CONSTRUCTION / 77. GLAZIER
CONSTRUCTION / 78. JOINERY
CONSTRUCTION / 79. TOILET PARTITIONS
CONSTRUCTION / 80. FLOORING CARPET / VINYL
CONSTRUCTION / 81. FLOORING TIMBER
CONSTRUCTION / 82. CERAMIC TILING
CONSTRUCTION / 83. BLINDS
CONSTRUCTION / 84. HANDRAILS / METALWORK
CONSTRUCTION / 85. SIGNAGE
CONSTRUCTION / 86. BITUMEN PAVING
CONSTRUCTION / 87. LANDSCAPING
CONSTRUCTION / 88. FINAL CLEAN
CONSTRUCTION / 89. PERSONAL HAZARDS
CONSTRUCTION / 90. PLANT / MACHINERY
CONSTRUCTION / 91. SUPERVISION OF APPRENTICES (APPRENTICES, TRAINEES & YOUNG WORKERS)
POST CONSTRUCTION / 1. COMMISSION PLANT
POST CONSTRUCTION / 2. BUILDING MAINTAINABILITY
Hazard / risk
Fire and Explosion
Default risk level
Default residual risk
Default control measure
Isolate fuel sources from ignition sources. Purge all traces of flammable or combustible materials from drums, vessels and tanks which are to be welded prior to welding, and preferably fill with an inert substance such as nitrogen gas or water. Use fire resistant barriers to prevent welding sparks accidently reaching flammable and combustible materials. Check work areas are well ventilated to prevent accumulation of flammable vapours in the work area. Check work area is free from rubbish, paper or dust that could be potential fuel sources or produce dust explosions. Use flash back arrestors on gas hoses to prevent the flames travelling back and igniting the gas in cylinder. Drain and purge equipment, such as gas hoses, and lock the gas off at the valve immediately after use. Do not store flammable and combustible materials near welding area. Keep and maintain firefighting equipment near welding area.
Default responsible party
Tags
High-risk category
Active
Save Library Risk