PRA Builder
Projects
Risk Library
High-Risk Work Items
Edit Library Risk
Library risks are templates. Project copies can be edited independently.
Section
Choose section
PRE-CONSTRUCTION / 1. BRIEF
PRE-CONSTRUCTION / 2. DESIGN
PRE-CONSTRUCTION / 3. CONSULTANTS
PRE-CONSTRUCTION / 4. PROGRAM
PRE-CONSTRUCTION / 5. APPROVALS
PRE-CONSTRUCTION / 6. EXISTING BUILDING
PRE-CONSTRUCTION / 7. INSURANCES
PRE-CONSTRUCTION / 8. CONTRACTORS
PRE-CONSTRUCTION / 9. MAINTENANCE
PRE-CONSTRUCTION / 10. BUILDABILITY
PRE-CONSTRUCTION / 11. INDUSTRIAL
PRE-CONSTRUCTION / 12. HEALTH SURVEILLANCE
CONSTRUCTION / 1. EMERGENCY PLANNING
CONSTRUCTION / 2. PUBLIC DEMONSTRATION
CONSTRUCTION / 3. SITE ESTABLISHMENT
CONSTRUCTION / 4. ACCESS / EGRESS & HOUSEKEEPING
CONSTRUCTION / 5. CAR PARKING AND PEDESTRIAN MOVEMENT
CONSTRUCTION / 6. TRAFFIC
CONSTRUCTION / 7. EMERGENCY VEHICLES
CONSTRUCTION / 8. SEGREGATION
CONSTRUCTION / 9. PUBLIC PROTECTION
CONSTRUCTION / 10. MANUAL HANDLING
CONSTRUCTION / 11. NOISE
CONSTRUCTION / 12. WORKING AT HEIGHTS
CONSTRUCTION / 13. PENETRATIONS
CONSTRUCTION / 14. FALLING OBJECTS
CONSTRUCTION / 15. CRANES
CONSTRUCTION / 16. CONCRETE PUMPS
CONSTRUCTION / 17. INSTALLING TILT UP OR PRE-CAST CONCRETE PANELS
CONSTRUCTION / 18. INSTALLING HANDRAILS & TEMPORARY EDGE PROTECTION
CONSTRUCTION / 19. WORK ON OR NEAR CHEMICAL, FUEL OR REFRIGERANT LINES
CONSTRUCTION / 20. USING A MOBILE SCAFFOLD / EWP
CONSTRUCTION / 21. CONFINED SPACES
CONSTRUCTION / 22. WORK ON OR NEAR PRESSURISED GAS PIPES OR MAINS
CONSTRUCTION / 23. ELECTRICAL WORK
CONSTRUCTION / 24. ELECTRICAL ISOLATION
CONSTRUCTION / 25. ELECTRICAL RE-ENERGISATION
CONSTRUCTION / 26. USING ELECTRICAL TOOLS
CONSTRUCTION / 27. ASBESTOS
CONSTRUCTION / 28. USE OF HAZARDOUS CHEMICALS / SUBSTANCES
CONSTRUCTION / 29. ERECTING SITE FENCING
CONSTRUCTION / 30. MOBILE PLANT
CONSTRUCTION / 31. USE OF TOOLS / MACHINERY (Minor Plant)
CONSTRUCTION / 32. WORKERS IN AREAS OF HEAVY PLANT / VEHICLE MOVEMENT
CONSTRUCTION / 33. WORKING ON OR NEAR PUBLIC ROADS
CONSTRUCTION / 34. WORKING ON OR NEAR WATER
CONSTRUCTION / 35. EXCAVATIONS
CONSTRUCTION / 36. EXTREME HEAT
CONSTRUCTION / 37. ENVIRONMENTAL
CONSTRUCTION / 38. SUBSTATIONS WORKS (Installation or Removal)
CONSTRUCTION / 39. WORK ON OR NEAR ENERGISED ELECTRICAL INSTALLATIONS OR SERVICES
CONSTRUCTION / 40. SHIPPING CONTAINERS AND SITE SHEDS
CONSTRUCTION / 41. DELIVERY / REMOVAL
CONSTRUCTION / 42. DAILY USE
CONSTRUCTION / 43. TREE REMOVAL
CONSTRUCTION / 44. DEMOLITION
CONSTRUCTION / 45. BULK EARTHWORKS
CONSTRUCTION / 46. DETAILED EARTHWORKS / DRAINAGE
CONSTRUCTION / 47. INSTALLING ELECTRICITY TO SITE SHED AND TEMPORARY BOARDS FOR WORK SITE
CONSTRUCTION / 48. FORMWORK
CONSTRUCTION / 49. REINFORCEMENT
CONSTRUCTION / 50. POST TENSIONING (PT)
CONSTRUCTION / 51. CONCRETE POURS
CONSTRUCTION / 52. SCAFFOLD
CONSTRUCTION / 53. WELDING
CONSTRUCTION / 54. STRUCTURAL STEEL
CONSTRUCTION / 55. BLOCKWORK / BRICKWORK / ROCK WALLS
CONSTRUCTION / 56. LIFT CONSTRUCTION
CONSTRUCTION / 57. WATERPROOFING
CONSTRUCTION / 58. RENDER
CONSTRUCTION / 59. ALUCABOND OR SIMILAR
CONSTRUCTION / 60. ROOF TRUSSES
CONSTRUCTION / 61. METAL ROOFER
CONSTRUCTION / 62. ROOF TILING
CONSTRUCTION / 63. MEMBRANE
CONSTRUCTION / 64. SOFFIT
CONSTRUCTION / 65. ROOF RESTRAINT SYSTEM
CONSTRUCTION / 66. SPRINKLERS
CONSTRUCTION / 67. FIRE SERVICES
CONSTRUCTION / 68. HYDRAULIC SERVICES
CONSTRUCTION / 69. SECURITY
CONSTRUCTION / 70. DATA
CONSTRUCTION / 71. MECHANICAL
CONSTRUCTION / 72. DRY WALLS AND CEILINGS
CONSTRUCTION / 73. CARPENTRY FIX
CONSTRUCTION / 74. SUNSHADES
CONSTRUCTION / 75. WINDOWS AND DOORS
CONSTRUCTION / 76. PAINTER
CONSTRUCTION / 77. GLAZIER
CONSTRUCTION / 78. JOINERY
CONSTRUCTION / 79. TOILET PARTITIONS
CONSTRUCTION / 80. FLOORING CARPET / VINYL
CONSTRUCTION / 81. FLOORING TIMBER
CONSTRUCTION / 82. CERAMIC TILING
CONSTRUCTION / 83. BLINDS
CONSTRUCTION / 84. HANDRAILS / METALWORK
CONSTRUCTION / 85. SIGNAGE
CONSTRUCTION / 86. BITUMEN PAVING
CONSTRUCTION / 87. LANDSCAPING
CONSTRUCTION / 88. FINAL CLEAN
CONSTRUCTION / 89. PERSONAL HAZARDS
CONSTRUCTION / 90. PLANT / MACHINERY
CONSTRUCTION / 91. SUPERVISION OF APPRENTICES (APPRENTICES, TRAINEES & YOUNG WORKERS)
POST CONSTRUCTION / 1. COMMISSION PLANT
POST CONSTRUCTION / 2. BUILDING MAINTAINABILITY
Hazard / risk
Injury during erecting
Default risk level
Default residual risk
Default control measure
The following work method should be followed for erecting scaffold: after enough components of the scaffold have been erected to support it, immediately install: A platform at least 450 mm wide along the full length of the section of scaffold, edge protection across the space between the uprights forming the outer frame of the scaffold at the level the scaffold has reached, a means of access (for example, temporary stairs or a ladder) to the level the scaffold has reached. Before the next level of the scaffold is erected, a platform should be installed below the level at a distance of not more than 2 metres. A section of the platform may be left open to allow the passing of planks or other scaffolding components between levels. A platform does not need to be installed on the bottom level of the scaffold. A platform may be removed after work has started two levels above the level from which the platform is to be removed. The following additional safe work practices should be followed when erecting scaffold. Scaffold ???fittings and other connections should be securely tightened. Where ???safety fittings??? are used, they should be fitted in accordance with the scaffolding plan. All scaffolding components should be installed as the scaffold is erected. For example, the installation of all bracing and ties, guy ropes or buttresses. Consider using specifically designed loading platforms and/or back propping to prevent overloading the building floor or the scaffold. Obtain certification from a competent person before erecting scaffold on awnings. Limit the number of workers on a scaffold at any one time. Develop a methodical work sequence if more than one worker will be on the scaffold at the one time for example, allocate specific tasks to each scaffolder. Work from a full deck of planks whenever possible. Do not climb on guardrails to gain extra height. Implement measures to control the risk of a fall if the internal gap (the gap between the inner edge of the length of the platform and the face of the building or structure immediately beside the platform) on scaffolds (includes hanging bracket scaffolds) is greater than 225 mm. For example, install edge protection, additional scaffold planks to minimise the size of the internal gap.
Default responsible party
Tags
High-risk category
Active
Save Library Risk
Cancel